Part of Sagro Company

P11 topside

The decommissioning process will occur in two stages: the removal of the topside, followed by the removal of the jacket.

The vessel Gulliver will transport the platform’s topside and jacket to Sagro Decom.

Where the topside is temporarily stored and awaits potential decommissioning.

Project highlights

Client

One-Dyas

Tonnage

1200 ton

Special detail

Designed for reuse

Location

50 kilometres off the Dutch North Sea coast

The project

Once the topside has been delivered, Gulliver will return to retrieve the jacket. Before departing the site, a seabed survey will be conducted to ensure no foreign objects remain.

Following the removal, the P11-E topside will be transported to the storage yard, where it will be stored, refurbished, and ultimately dismantled.